The CAST project consists of 6 Work Packages (WPs), each with a specific function and aim within the project. There is a direct mapping between the Work Packages and the specific requirements of the EC’s Call Text.
EC requirements (in parallel with tasks of the Work Programme 2002-2006) |
WP |
WP Content Description |
General requirement for good management |
WP0 |
Overall coordination |
Requirement for an inventory of applied methodologies covering aspects such as psychology of drivers and acceptability of measures (task 1 Work Programme 2002-2006) |
WP1 |
State-of-the-art on psychology of drivers and acceptability of measures (cf. SARTRE), i.e. studying and summarizing the underlying theoretical road user models |
WP2 |
Listing a typology of road safety campaigns and their evaluation methodologies applied in and beyond the EU |
Requirement for a methodology to evaluate public awareness campaigns (task 2 Work Programme 2002-2006) |
WP2 |
Providing an evaluation tool (for (cost-) effectiveness) for fieldworkers/policy makers: a tool for the evaluation of a single campaign and checklist for standardized reporting |
Requirement for a methodology for designing campaigns (task 3 Work Programme 2002-2006) |
WP3 |
Development of a manual to design and implement (cost-) effective campaigns, i.e. clear guidelines for best practices for fieldworkers/policy makers |
Requirement for an evaluation and test of this methodology by applying it to recent campaigns supported by the EC (task 4 Work Programme 2002-2006) |
WP4 |
Assessing the quality of the new developed evaluation method by application on a real campaign |
Requirement for designing a complete pan-European campaign (task 5 Work Programme 2002-2006) |
WP5 |
Designing and implementing a complete pan-European campaign to support the implementation of a measure that will recently be taken by the EU at that time |
General requirement for dissemination of results |
WP6 |
Dissemination |
Thematic Priority 1.6.2: Sustainable Surface Transport – Work Programme 2002-2006.
Project Management |
Work Package |
Main objectives |
Start month |
End month |
Partners |
WP0 |
Overall coordination of the technical activities
-
Overall legal, contractual, ethical, financial and administrative management
-
Establishing and maintaining the quality assurance - procedure
|
1 |
42 |
BIVV/IBSR
INRETS
PRP
SWOV
TØI
VTI
|
Technical Activities and demonstration Activities |
Work Package |
Main objectives |
Start month |
End month |
Partners |
WP1 |
-
Describe state-of-the-art regarding applicable theories of behaviour and effects of campaigns
Estimate (partial) effects of mass media campaigns by meta-analysis
-
Develop a general and theoretically based model for road safety campaigns by ascertaining campaign characteristics (key elements) that contribute to behaviour change and/or reduction in the number of accidents by meta-regression
-
Elaborate a road user model
-
State hypothesis about predictors for behavioural change, establish key elements and provide proposals for variables to be measured as integral parts of the evaluation of campaigns
|
1 |
36 |
TØI
BAST
CDV
DTF
FACTUM
IBDIM
ISEC
|
| WP2 |
|
1 |
36 |
BIVV/ISBR
DTF
IMOB
INRETS
Min. of Transport NL
TØI
UTh
ULFF
|
| WP3 |
|
1 |
36 |
INRETS
BAST
BFU
BIVV/IBSR
PRP
SIPSiVi
ISEC
UTh
TØI
VTI
|
| WP4 |
|
18 |
36 |
VTI
FACTUM
IMOB
IBDIM
Min. of Transport NL
UTh
ULFF |
| WP5 |
-
Design and implementation of a European road safety campaign aiming to encourage the effectiveness of a road safety measure. The campaign will run in Belgium, Greece, Denmark and Portugal.
-
The design and implementation of the campaign will be performed using the manual developed in WP3, so that WP5 can thus be regarded as a test of the tool developed in WP3.
|
24 |
42 |
BIVV/IBSR
PRP
RfSF
UTh |
Dissemination Activities |
Work Package |
Main objectives |
Start month |
End month |
Partners |
WP1 |
-
WP6 is solely devoted to disseminate the knowledge and technology produced within the CAST project among several target groups (field workers and policy makers)
-
In summary WP6 comprises the following activities: organising CAST-workshops, presentation of CAST on conferences, submitting papers to specialized journals, producing and distributing newsletters and producing and distributing CAST-posters and leaflets.
|
1 |
42 |
PRP
BIVV/IBSR
TØI
INRETS
VTI
DTF
FACTUM
SIPSiVi
IMOB
Min. of Transport NL
IBDiM
SWOV
Bfu
CDV
ISEC
UTh
ULFF
RfSF |
|